Oscar Romero Catholic School, Goring-by-Sea

We designed and installed 63 solar panels on this new sixth form block building for Portacabin. We used a flat roof system modified to suit the Portacabin modular building specifications.

Type of property: New Build Sixth Form Block
Location: Goring-by-Sea
Roof direction: South
No. of solar panels: 63 x 415w Panels
Duration of installation: 5 days

System Details

  • System Size: 24kw
  • Inverter: Solaredge SE25
5/5

“I had great confidence in this company from the first meeting. Dave explained every thing and answered my questions. The whole team were friendly and hard working. I would recomend them.”

Maureen Elsmere – Bognor Regis, West Sussex

Contact:

© 2020-2024 Sopoco Limited Registration No 15697148 – 31 Chatsworth Road – Worthing – West Sussex – BN11 1LY –  VAT No 467115880 . All Rights Reserved